Force10 Networks CC-C-BLNK-LC manual

Models: CC-C-BLNK-LC

1 38
Download 38 pages 44.89 Kb
Page 17
Image 17
After you slide the MXL 10/40GbE Switch in so that the connectors on the back of the blade touch the chassis midplane, the switch receives power from the chassis and automatically powers on. The chassis management controller (CMC) in the chassis validates that the switch blade is a supported I/O module before powering it on.

Figure 1-8. PowerEdge M1000e: Back View with Six MXL 10/40GbE Switch Blades

After you slide the MXL 10/40GbE Switch in so that the connectors on the back of the blade touch the chassis midplane, the switch receives power from the chassis and automatically powers on. The chassis management controller (CMC) in the chassis validates that the switch blade is a supported I/O module before powering it on.

When the switch powers on, the Boot loader loads the image from the local flash. The image initializes the hardware and brings the switch up in operational mode.

Installing and Configuring the Switch

17

Page 17
Image 17
Force10 Networks CC-C-BLNK-LC manual