Table
Ta b l e 1 - 3 . L E D St a t u s o f a 4 0 G b E Q S F P + P o r t w i t h B r e a k o u t C a b l e
Port LED | Color | Meaning | |
|
|
| |
| Off | All four 10GbE ports on a breakout cable are down. | |
Link Status | Yellow | At least one of the four 10GbE ports on a breakout | |
|
| cable is up. | |
|
|
| |
| Off | No traffic is being transmitted on any 10GbE port on | |
Activity |
| the breakout cable. | |
Blinking | Traffic is being transmitted or received on at least one | ||
| |||
| Green | of the 10GbE ports on the breakout cable. | |
|
|
|
Installation
Site Preparation
Before installing the switch or switches, make sure that the chosen installation location meets the following site requirements:
•Clearance — There is adequate front and rear clearance for operator access. Allow clearance for cabling, power connections, and ventilation.
•Cabling — The cabling is routed to avoid sources of electrical noise such as radio transmitters, broadcast amplifiers, power lines, and fluorescent lighting fixtures.
•Ambient Temperature — The ambient switch operating temperature range is 10° to 35ºC (50° to 95ºF).
NOTE: Decrease the maximum temperature by 1°C (1.8°F) per 300 m (985 ft.) above 900 m (2955 ft.).
•Relative Humidity — The operating relative humidity is 8% to 85%
Hardware Overview
13