4 INSTALLATION, WIRING AND MAINTENANCE OF THE PRODUCT

4.1Outline of installation, wiring and maintenance

4.1.1 Installation, wiring and maintenance procedures

MELSEC-Q

The outline and procedures for QD75 installation, wiring and maintenance are shown below.

 

STEP 1

Preparation

Refer to

 

Section 4.1

 

STEP 2

Installing the

Refer to

module

Section 4.2

 

 

STEP 3

 

Refer to

 

Section 4.3

Wiring the

 

module

STEP 4

 

 

Refer to

 

Section 4.3

Understand the "Handling precautions" and "Names of each part" of the module (QD75)

Install the module (QD75) on the base unit.

Wire the external device connection connector pins, and assemble the connector.

Connect the cable to the module (QD75)

The cables used to connect the QD75 with the drive unit, with the mechanical system input (each input/output signal), and with the manual pulse generator are manufactured by soldering each signal wire onto the "external device connection connector" sold separately.(Refer to "Applicable connector for external wiring" in Section 3.1 "Performance specifications" for the optional connector.)

Wire and connect the manufactured cable to QD75 after reading the precautions for wiring.

Confirming the

STEP 5

installation and

 

 

Confirm the connection

wiring

 

 

Refer to

 

 

Section 4.4

 

 

 

 

 

 

 

 

 

Operation of the positioning system.

Check the connection using GX Configurator-QP.

Servicing the module

STEP 6

 

Carry out maintenance

Carry out maintenance as necessary.

Refer to

 

 

 

 

 

Section 4.5

 

 

 

STEP 7

 

Dispose of the QD75

When the QD75 is no longer necessary,

 

Refer to

 

dispose of it with the specified methods.

 

 

Section 4.5

 

 

 

4 - 2

Page 74
Image 74
Mitsubishi Electronics QD75P, QD75D user manual INSTALLATION, Wiring and Maintenance of the Product