1PRODUCT OUTLINE

1.2.2 Outline of starting

MELSEC-Q

The outline for starting each control is shown with the following flowchart.

It is assumed that each module is installed, and the required system configuration, etc., has been prepared.

Flow of starting

Installation and connection of module

Preparation

Setting of hardware

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Major position-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Control

 

 

 

 

 

 

 

 

High-level positioning

 

 

 

OPR control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Manual control

 

 

 

 

 

 

ing control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

functions

 

 

 

 

 

·Position control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

·Block start (Normal start)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

·Speed control

 

 

·Machine OPR control

 

·JOG operation

 

 

 

 

 

 

 

 

 

 

 

 

 

·Speed-position

 

 

·Condition start

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

switching control

 

 

·Wait start

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

·Inching operation

 

 

 

 

 

 

 

 

 

 

 

 

 

·Position-speed

 

 

·Simultaneous start

 

 

 

 

·Fast OPR control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

switching control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

·Repeated start

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

·Manual pulse generator operation

 

 

 

 

 

 

 

 

 

 

 

 

 

·Other control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Positioning parameters

OPR parameters

Positioning data

Block start data

Set the positioning parameters.

)

Pr.1 to Pr.42 , Pr.150 )

Set the OPR parameters.

) Pr.43 to Pr.57 )

 

Set the positioning data.

)

Da.1 to Da.10 )

Set the block start data.

) Da.11 to Da.19 )

Control data

Start signal

Control start

Set the positioning start No.

)

Cd.3 )

Set the positioning

 

 

starting point No.

 

 

) Cd.4 )

 

 

Input the start signal.

Method (1) Turn ON the QD75 start signal from the

PLC CPU

Method (2) Issue the PSTRT instruction from the PLC CPU. Method (3) Turn the QD75 external start signal ON

Set the JOG speed

Set the manual pulse

generator enable flag to "1".

) Cd.17 )

) Cd.21 )

 

 

 

 

 

 

 

 

 

 

 

 

 

Set the inching

 

 

 

 

 

 

 

 

 

 

 

 

movement amount

 

 

 

 

 

 

 

 

 

 

 

 

to other than 0.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

) Cd.16 )

Set the inching

movement

 

 

 

 

 

 

 

 

 

 

Set the manual pulse generator

amount to 0.

 

 

 

 

 

 

 

 

 

 

1 pulse input magnification.

 

 

 

 

) Cd.16 )

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

) Cd.20 )

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Turn the QD75 JOG start signal

Operate the

manual pulse

ON from the PLC CPU

generator

 

Control end

Operation

Stop

1 - 18

Page 38
Image 38
Mitsubishi Electronics QD75P, QD75D user manual Outline of starting