9 MAJOR POSITIONING CONTROL

Positioning data setting example

MELSEC-Q

[Reference axis and interpolation axis are designated as axis 1 and axis 2, respectively.]

The following table shows setting examples when "2-axis circular interpolation control with sub point designation (INC circular sub)" is set in positioning data No. 1 of axis 1. (The required values are also set in positioning data No. 1 of axis 2.)

Axis

Setting item

Operation pattern

Da.2 Control system

 

Da.3

Acceleration time

 

 

No.

1

Da.4

Deceleration time

No.

No.

 

 

 

 

data

Da.5

Axis to be

 

interpolated

Positioning

 

Da.6

Positioning address/

 

 

movement amount

1

Da.7

Arc address

Axis

 

 

 

 

Da.8 Command speed

Dwell time

Da.10 M code

Axis 1

 

Axis 2

 

 

 

 

 

 

 

 

 

 

 

(reference

(interpolation

 

 

Setting details

 

 

 

 

axis) setting

axis) setting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

example

example

 

 

 

 

 

 

 

 

 

 

Positioning

 

Set "Positioning complete" assuming the next positioning

complete

 

data will not be executed.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INC circular

 

Set incremental system, 2-axis circular interpolation control

sub

 

 

with sub point designation.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Designate the value set in "

 

 

 

 

 

 

1

 

 

Pr.25

Acceleration time 1" as

 

 

the acceleration time at start.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Designate the value set in "

 

 

 

 

 

 

0

 

 

Pr.10

Deceleration time 0" as

 

 

the deceleration time at deceleration.

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

Set the axis to be interpolated (partner axis).

 

 

 

 

 

 

 

 

 

 

 

 

If the self-axis is set, an error will occur.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8000.0

m

6000.0

m

Set the movement amount. (Assuming that the "

 

Pr.1

Unit

setting" is set to "mm".)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4000.0

m

3000.0

m

Set the sub point address. (Assuming that the "

 

Pr.1

Unit

setting" is set to "mm".)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6000.00

 

 

Set the speed during movement. (Designate the composite

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

speed in "

Pr.20

Interpolation speed designation

 

mm/min

 

 

 

 

method".)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Set the time the machine dwells after the positioning stop

500ms

 

 

(pulse output stop) to the output of the positioning complete

 

 

 

 

signal.

 

 

 

 

 

 

10

 

 

Set this when other sub operation commands are issued in

 

 

combination with the No. 1 positioning data.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Refer to Section 5.3 "List of positioning data" for information on the setting details.

POINT

Set a value in " Da.8 Command speed" so that the speed of each axis does not exceed the " Pr.8 Speed limit value". (The speed limit does not function for the speed calculated by the QD75 during interpolation control.)

9 - 58

Page 358
Image 358
Mitsubishi Electronics QD75P, QD75D With sub point designation, Pr.25 Acceleration time 1 as Acceleration time at start