11 MANUAL CONTROL

MELSEC-Q

JOG operation timing and processing time

The following drawing shows details of the JOG operation timing and processing time.

 

 

ON

 

 

 

 

Forward run JOG start signal

 

OFF

 

 

 

 

[Y8, YA, YC, YE]

 

t2

 

 

Reverse run JOG start signal

 

OFF

 

 

 

 

[Y9, YB, YD, YF]

 

ON

 

 

 

 

 

 

 

 

 

BUSY signal [XC, XD, XE, XF]OFF

 

 

 

 

 

 

t1

 

 

 

 

 

 

 

 

 

t4

 

Md. 26 Axis operation status

 

Standing by

In JOG operation

 

Standing by

 

 

 

t3

 

 

 

Pulse output to an

 

 

 

 

 

 

external source (PULSE)

 

 

 

 

 

 

Positioning operation

 

 

 

 

 

 

Positioning complete signal

OFF

 

 

 

 

[X14, X15, X16, X17]

 

 

 

 

 

 

Fig. 11.5 JOG operation timing and processing times

Normal timing times

 

 

Unit: ms

 

 

t1

t2

 

t3

t4

 

 

1.0 to 3.0

0 to 1.8

2.7

to 4.4

0 to 1.8

Delays may occur in the t1 timing time due to the operation status of other axes.

11 - 6

Page 446
Image 446
Mitsubishi Electronics QD75P, QD75D user manual JOG operation timing and processing times