11 - 19

MELSEC-Q
11 MANUAL CONTROL
Inching operation timing and processing times

The following drawing shows the details of the inching operation t iming and

processing time.

Reverse run JOG start signal
[Y9,YB,YD,YF]
BUSY signal
[XC,XD,XE,XF]
Forward run JOG start signal
[Y8,YA,YC,YE]
ON
Standing by Inching operationAxis operation
status
t1
t2
t4
Pulse output to an external
source
(PULSE)
Positioning operation
Positioning complete
signal
[X14,X15,X16,X17]
Md.26
ON
ON
OFF
OFF
OFF
OFF
t3
Standing by

Fig. 11.13 Inching operation timing and proces sing times

Normal timing times Unit : ms

t1 t2 t3 t4

1.0 to 3.0 2.7 to 4.4 0 to 1.8 Depending on

parameters

Depending on the operating statuses of the other axes, delay may occur in the

t1 timing time.