15 TROUBLESHOOTING

MELSEC-Q

 

Related buffer memory

Set range

 

 

 

address

 

Remedy

 

 

 

(Setting with sequence program)

 

Axis 1

Axis 2

Axis 3

Axis 4

 

 

 

 

 

 

 

 

 

 

 

 

 

• Check that there is no influence from noise.

 

• Check hardware for possibility of fault.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Review the sequence program which turns ON/OFF

 

PLC READY signal (Y0).

 

• Cancel the error with an axis error reset.

 

 

 

 

 

 

 

 

 

 

 

 

(Refer to Section 15.1[3])

 

 

 

 

 

 

 

 

 

 

 

 

 

Check the drive unit power, wiring with the drive unit,

 

and connection of connectors, and cancel the error

 

 

 

 

 

 

with an axis error reset. (Refer to Section 15.1[3])

 

Check that there is no error on the personal computer

 

side I/F to which a cable is connected.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

After making an axis error reset (refer to [3] in Section

 

15.1), perform manual control operation (refer to

 

Chapter 11) to move the axis to the other position in

 

 

 

 

 

 

 

 

 

 

 

 

order that the upper limit signal (FLS) will not turn OFF.

 

 

 

 

 

 

After making an axis error reset (refer to [3] in Section

 

15.1), perform manual control operation (refer to

 

Chapter 11) to move the axis to the other position in

 

 

 

 

 

 

 

 

 

 

 

 

order that the lower limit signal (RLS) will not turn OFF.

 

 

 

 

 

 

Check whether the stop commands (output

 

 

 

 

 

 

signals/external inputs to QD75) are turned ON or

 

 

 

 

 

 

OFF. Turn OFF the ON commands.

 

 

 

 

 

 

• Output signals to QD75

 

 

 

 

 

 

Axis 1: Y4, Axis 2: Y5, Axis 3: Y6, Axis 4: Y7

 

• External input

 

 

 

 

 

 

Connectors for external device connection:

 

 

 

 

 

 

Stop signals (STOP)

 

 

 

 

 

 

After confirming the stop command status, cancel the

 

 

 

 

 

 

error with an axis error reset. Then turn ON a start

 

 

 

 

 

 

signal. (Refer to Section 15.1[3])

 

Turn ON the PLC READY signal (Y0) with the BUSY

 

signals of all axes OFF.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Validate the OPR retry function

 

 

 

 

 

<OPR retry>

(set value: 1). (Refer to Section 12.1.1)

 

78

228

378

528

• Move the workpiece from the current position (on OP)

 

0, 1

 

 

 

 

 

using the manual control operation (refer to Chapter

 

 

 

 

 

 

 

 

 

 

 

 

11), then carry out a machine OPR again.

 

 

 

 

 

 

 

15 - 7

Page 611
Image 611
Mitsubishi Electronics QD75D, QD75P Related buffer memory Set range, Remedy, Side I/F to which a cable is connected