Dean Millivolt Gas Fryers (Non-CE)

Installation & Operation Manual

TABLE OF CONTENTS

 

 

Page #

1.

INTRODUCTION

1-1

1.1

After Purchase

1-1

1.2

Ordering Parts

1-1

1.3

Service Information

1-1

1.4

Safety Information

1-2

1.5

Service Personnel

1-2

2.

IMPORTANT INFORMATION

2-1

2.1

Receiving and Unpacking Equipment

2-1

2.2

General

2-1

2.3

Principles of Operation

2-2

2.4

Rating Plate

2-2

2.5

Pre-Installation

2-3

2.6

Equipment Installed at High Altitudes

2-4

2.7

Air Supply and Ventilation

2-4

3.

INSTALLATION

3-1

3.1

Installing the Fryer

3-1

3.2

Leg and Caster Installation

3-1

3.3

Leveling the Fryer

3-2

3.4

Gas Connections

3-4

3.5

Adjustments/Adaptation to Different Gases

3-8

3.6

Gas Inputs

3-9

3.7

Gas Conversion Procedures

3-10

3.8

Gas Conversion Components

3-11

3.9

Electrical Components

3-12

4.

FRYER OPERATIONS

4-1

4.1

Initial Start-up

4-1

4.2

Boil-Out Procedure

4-3

4.3

Final Preparation

4-4

Page 4
Image 4
Frymaster SM35 operation manual Table of Contents