
CHAPTER 4: Installing Components | www.gateway.com |
To remove and install a ROMB battery pack for the mezzanine RAID card:
1Follow the instructions in “Preventing static electricity discharge” on page 30. Make sure that you turn off the server, then unplug the power cord(s) and all other cables connected to the server.
2Follow the instructions in “Opening the server case” on page 31.
3Push the release lever (1), then lift the ROMB battery pack for the mezzanine RAID card (2) out of the chassis.
4Align the new battery with the battery slot, then push the new battery into the slot until it clicks into place.
5Follow the instructions in “Closing the server case” on page 32.
Installing and removing an optional mezzanine boardThis server has two types of optional mezzanine boards. They include a
To install an optional mezzanine board:
1Follow the instructions in “Preventing static electricity discharge” on page 30. Make sure that you turn off the server, then unplug the power cord(s) and all other cables connected to the server.
2Follow the instructions in “Opening the server case” on page 31.
3Remove the PCI riser assembly by following the instructions in “Installing and removing PCI expansion cards” on page 44.
56