Heat & Glo • Soho-CE • 2111-900 Rev. D • 6/07
14
Figure 5.8

2. Vertical Termination - (continued)

Three Elbows

V
2
H
2
V
1

INSTALLED

HORIZONTALLY

H
1
Three Elbows
V1 Minimum H1 + H2 Maximum
30 cm 61 cm
61 cm 91 cm
91 cm 1.5 m
1.2 m 2.1 m
1.5 m 4.3 m
V1 + V2 + H1 + H2 Maximum = 11.9 m
H1 + H2 Maximum = 4.3 m