Heat & Glo • Soho-CE • 2111-900 Rev. D • 6/07
8

A. Flue Termination Minimum Clearances

Fire Risk.
Explosion Risk.
Maintain ue clearance to combustibles as
speci ed.
Do not pack air space with insulation or other
materials.
Failure to keep insulation or other materials
away from ue pipe may cause re.
Roof Pitch H (Min.) Meters
Flat to 6/12..........................................................0.30*
Over 6/12 to 7/12 ................................................0.38*
Over 7/12 to 8/12 ................................................0.46*
Over 8/12 to 9/12 ................................................0.61*
Over 9/12 to 10/12 ................................................0.76
Over 10/12 to 11/12 ..............................................0.99
Over 11/12 to 12/12 ..............................................1.22
Over 12/12 to 14/12 ..............................................1.55
Over 14/12 to 16/12 ..............................................1.83
Over 16/12 to 18/12 ..............................................2.13
Over 18/12 to 20/12 ..............................................2.29
Over 20/12 to 21/12 ..............................................2.44
Figure 4.1
Figure 4.2 Minimum height from roof to lowest discharge
opening
4
4 Termination Locations

Measure horizontal clearances from this surface.

Measure vertical clearances from this surface.

Figure 4.3 Multiple Vertical Termination

Figure 4.2 speci es minimum ue heights for various

pitched roofs.

(See Figure 4.4 for speci c clearances)
* 91 cm minimum in snow regions
HORIZONTAL
OVERHANG
VERTICAL
WALL
TERMINATION
CAP
30 cm
X
ROOF PITCH
IS X/ 30 cm
LOWEST
DISCHARGE
OPENING
61 cm
MIN.
61 cm
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
Gas Termination Wood & Fuel Oil Termination
A15 cm 51 cm.
46 cm
A
GAS
TERMINATION
61cm
(MINIMUM) TO
PERPENDICULAR
WALL (GAS ONLY)
GAS, WOOD OR FUEL
OIL TERMINATION
WARNING