Step 2. Framing the Appliance

Appliance framing can be built before or after the appliance is set in place. Framing should be positioned to accommo- date wall coverings and appliance facing material. The dia- gram below shows framing reference dimensions.

CAUTION: MEASURE APPLIANCE DIMENSIONS AND VERIFY FRAMING METHODS AND WALL COVERING DETAILS BEFORE FRAMING.

VENT

FRAMING

HOLE

*The center of the framing hole is one (1) inch (25.4mm) above the center of the hori- zontal vent pipe.

The framing headers may rest on the appliance stand-offs.

E D *

Framing should be constructed of 2 X 4 lumber or heavier.

Models

A

B

C

D

E

SL-750TRS-IPI-D

42”

38 1/4”

16 1/4”

41”

27 7/8”

SL-550TRS-IPI-D

37”

33”

16 1/4”

36 1/2”

24 3/8”

SL-350TRS-C

34”

31”

16 1/4”

35 1/2”

22 3/8”

 

 

 

 

 

 

B

C

A

3”

WALL STUD

NON-COMBUSTIBLE ZONE

2-1/4”IS DEFINED BY 3” ABOVE THE ELBOW FOR THE ENTIRE

WIDTH AND DEPTH (BEHIND THE

FRONT HEADER) OF THE FIREBOX.

Figure 5. Framing Dimensions

Heat & Glo • SL-350TRS-C, SL-550/750TRS-IPI-D2065-985 Rev. J • 5/06

19

Page 19
Image 19
Heat & Glo LifeStyle SL-750TRS-IPI-D owner manual Framing the Appliance, Framing Dimensions