Honeywell 96D user manual Surface Mount Installation

Models: 96D

1 80
Download 80 pages 19.02 Kb
Page 15
Image 15
Surface Mount Installation

Introduction

Installation Instructions

Surface Mount Installation

It is recommended that controllers be installed 5 feet (1.5 m) above the floor, at approximate eye level.

16 cm

6 5/16

33.6 cm

13 1/4

1.52 m

5.0 ft

Mark the holes as shown:

Height markers 6 13/32” apart

Width markers 10 9/16” apart

Pre-drill 1/4” mounting holes as needed

Securely mount the 96D using the appropriate screws

Wiring for the unit must be passed through the knock-outs provided at the bottom of the unit.

M-511401

96d User Manual

11

8/10

Honeywell

 

Page 15
Image 15
Honeywell 96D user manual Surface Mount Installation