A S S E M B LY STEP 7 |
|
LOWER LINK ARM | LOWER |
| HANDLEBAR |
TEFLON WASHERS | |
| SPACER |
LOWER HANDLEBAR |
|
NUT (P) |
|
BOLT (M) |
|
SPACER (O) |
|
TEFLON WASHER (N) |
|
LOWER LINKARM |
|
A)Open HARDWARE BAG FOR STEP 7.
B)Slide SPACER (O) into LOWER HANDLEBAR.
C)Place TEFLON WASHERS (N) on either side of SPACER (O). While holding TEFLON WASHERS (N) slide LOWER LINK ARM into bottom end of LOWER HANDLEBAR.
D)Insert BOLT (M) into LOWER HANDLEBAR and secure using NUT (P).
E)Repeat on other side.
HARDWARE BAG FOR STEP 7 CONTENTS :
IMPORTANT PRECAUTIONS INTRODUCTION
ASSEMBLY
BEFORE YOU BEGIN
ELLIPTICAL OPERATION
CONDITIONING GUIDELINES
BOLT (M) 60 mm Qty: 2
TEFLON WASHER (N)
28.4mm
Qty: 4
SPACER (O) 44 mm axis Qty: 2
NUT (P)
INSIDE DIAMETER:
8mm Qty: 2
13
LIMITED TROUBLESHOOTING WARRANTY & MAINTENANCE