Hoshizaki 73168 Cabinet Defrost Power Switch ON, Rail Cooling Switch OFF, Rail Defrost

Models: 73168

1 66
Download 66 pages 20.59 Kb
Page 11
Image 11

a)Cabinet Defrost: Power Switch "ON," Rail Cooling Switch "OFF"

CLLV continues, CabFM, Comp, ConFM, and PH de-energize. DH energizes and warms DTh to 49°F (9.4°C) (or the 100-minute defrost termination timer expires or DTst warms to 120°F±5°F (49°C±3°C)). When DTh reaches 49°F (9.4°C), DH deenergizes, CLLV continues and a 5 minute Comp delay timer starts. When the 5-minute Comp delay timer expires, CabFM and PH energize for 10 seconds. Comp and ConFM then energize and a 5-minute CabFM and PH delay timer starts. After the 5-minute CabFM and PH delay timer expires, CabFM and PH energize.

b)Cabinet Defrost: Power Switch "ON," Rail Cooling Switch "NORMAL" or "LOW"

(1)Cabinet cool down achieved, rail still cooling

Comp, CondFM, RailFM, and RLLV continue. CabFM and PH deenergize, and CLLV remains de-energized. DH energizes and warms DTh to 49°F (9.4°C) (or the 100-minute defrost termination timer expires or the DTst warms to 120°F±5°F (49°C±3°C)). When DTh reaches 49°F (9.4°C), DH deenergizes, Comp, ConFM, RailFM, and RLLV continue. CabFM and PH energize for 10 seconds. CLLV then energizes and a 5-minute CabFM and PH delay timer starts. After the 5-minute CabFM and PH delay timer expires, CabFM and PH energize.

(2)Cabinet still cooling, rail cool down achieved

RailFM continues (RailFM continues when rail switch is in the "NORMAL" position and per F9 setting when in the "LOW" position), RLLV and DH energize,

CabFM, Comp, ConFM, and PH de-energize. CLLV de-energizes for 2 seconds, then energizes again. DH warms DTh to 49°F (9.4°C) (or the 100-minute defrost termination timer expires or the DTst warms to 120°F±5°F (49°C±3°C)). When DTh reaches 49°F (9.4°C), DH deenergizes, RailFM continues, RLLV deenergizes, CLLV energizes, and a 5-minute Comp delay timer starts. When the 5-minute Comp delay timer expires, CLLV and RailFM continue. CabFM and PH energize for 10 seconds. Comp and ConFM then energize and a 5-minute CabFM and PH delay timer starts. After the 5-minute CabFM and PH delay timer expires, CabFM and PH energize.

6. Rail Defrost

For rail defrost (manual defrost), remove product from the rail area and store in a properly refrigerated area, then move the rail cooling switch to the "OFF" position.

Legend: CabFM–cabinet fan motor; CB–control board; Comp–compressor; ConFM–condenser fan motor; CLLV–cabinet liquid line valve; CTh–cabinet thermistor; DH–defrost heater; DT–defrost timer; DTh–defrost thermistor; DTst–defrost thermostat; PH–perimeter heater; RailFM–rail fan motor; RLLV–rail liquid line valve; RTh–rail thermistor

11

Page 11
Image 11
Hoshizaki 73168 service manual Cabinet Defrost Power Switch ON, Rail Cooling Switch OFF, Rail Defrost