Hoshizaki KM-1300MRH, KM-1300MWH, KM-1300MAH Removal And Replacement Of Compressor Important

Models: KM-1300MRH KM-1300MAH KM-1300MWH

1 62
Download 62 pages 15.83 Kb
Page 44
Image 44
3.REMOVAL AND REPLACEMENT OF COMPRESSOR IMPORTANT

3.REMOVAL AND REPLACEMENT OF COMPRESSOR IMPORTANT

Always install a new Drier every time the sealed refrigeration system is opened. Do not replace the Drier until after all other repair or replacement has been made.

Note: When replacing a Compressor with a defective winding, be sure to install the new Start Capacitor and Start Relay supplied with the replacement Compressor. Due to the ability of the POE oil in the compressor to absorb moisture quickly, the Compressor must not be opened more than 15 minutes for replacement or service. Do not mix lubricants of different compressors even if both are charged with R-404A, except when they use the same lubricant.

1)Turn off the power supply.

2)Remove the panels.

3)Recover the refrigerant and store it in an approved container.

4)Remove the Terminal Cover on the Compressor, and disconnect the Compressor Wiring.

5)Remove the Discharge and Suction Pipes using brazing equipment.

6)Remove the Hold-down Bolts, Washers and Rubber Grommets.

7)Slide and remove the Compressor. Unpack the new Compressor package. Install the new Compressor.

8)Attach the Rubber Grommets of the prior Compressor.

9)Sandpaper the Suction, Discharge and Process Pipes.

10)Place the Compressor in position, and secure it using the Bolts and Washers.

11)Remove plugs from the Suction, Discharge and Process Pipes.

12)Braze the Process, Suction and Discharge lines (Do not change this order), while purging with nitrogen gas flowing at the pressure 3 - 4 PSIG.

13)Install the new Drier.

44

Page 44
Image 44
Hoshizaki KM-1300MRH, KM-1300MWH, KM-1300MAH service manual Removal And Replacement Of Compressor Important