V.REMOVAL AND REPLACEMENT OF COMPONENTS IMPORTANT
Ensure all components, fasteners and thumbscrews are securely in place after the equipment is serviced.
IMPORTANT
1.The Polyol Ester (POE) oils used in
2.Always install a new filter drier every time the sealed refrigeration system is opened.
3.Do not leave the system open for longer than 5 minutes when
replacing or servicing parts.
1. SERVICE FOR REFRIGERANT LINES
[a] REFRIGERANT RECOVERY
The icemaker unit is provided with two Refrigerant Access Valves on the
[b]EVACUATION AND RECHARGE [R-404A]
1)Attach Charging Hoses, a Service Manifold and a Vacuum Pump to the system. Be sure to connect Charging Hoses to both
IMPORTANT
The vacuum level and Vacuum Pump may be the same as those for current refrigerants. However, the rubber hose and gauge manifold to be used for evacuation and refrigerant charge should be exclusively for POE oils.
2)Turn on the Vacuum Pump. Never allow the oil in the Vacuum Pump to flow back- ward.
3)Allow the Vacuum Pump to pull down to a 29.9" Hg vacuum. Evacuating period depends on pump capacity.
4)Close the
42