Periodic maintenance

Periodic maintenance overview

Perform periodic inspections on the components in this section to ensure that the HP POD 40c NA continues to perform within the designed parameters.

Qualified personnel

Qualified personnel are identified as personnel who are:

Properly trained in the operation and maintenance of the HP POD 40c NA

Customer-authorized to conduct maintenance activities

Qualified personnel can be:

HP personnel

Agents for HP

Site maintenance personnel

Cooling system maintenance schedule

Component to be inspected

Task

Frequency

Capable Party

 

 

 

 

 

 

Air filters

Inspect and replace as necessary

Quarterly, or as

Qualified personnel

 

 

 

 

needed

 

 

Air filter differential pressure

Inspect and test, replace as

Annually

Qualified personnel

 

sensor

necessary

 

 

 

Cooling system leak check

Verify there is no visible chilled

Quarterly

Qualified personnel

 

 

water leak from:

 

 

 

 

Heat exchanger

 

 

 

 

Cold water supply piping

 

 

 

 

Cold water return piping

 

 

 

 

If a leak is detected, see "Leak

 

 

 

 

detection maintenance (on page

 

 

 

 

63)"

 

 

 

Condensate drain pans

Inspect pans:

Quarterly

Qualified personnel

 

 

Free of debris

 

 

 

 

No leaks

 

 

 

 

Leakage detectors are in

 

 

 

 

 

proper position

 

 

 

 

Clean pans as necessary

 

 

 

Condensate drain pan sensors

Inspect and test, replace as

Quarterly

Qualified personnel

 

 

necessary

 

 

 

 

If a leak is detected, see "Leak

 

 

 

 

detection maintenance (on page

 

 

 

 

63)"

 

 

 

 

 

 

 