HP Performance Optimized Data Center (POD) 40cp manual Humidifier if installed, Ecs

Models: Performance Optimized Data Center (POD) 40cp

1 79
Download 79 pages 43.3 Kb
Page 64
Image 64

2.Power down the IT equipment in the zone where the leak is located.

3.Determine the affected heat exchanger.

4.Close and danger tag the supply and return valves to the affected heat exchanger.

If the heat affected exchanger cannot be identified, close all the heat exchanger supply and return valves in the affected zone and open one supply valve at a time to determine the location of the leak.

5.Repair the leak or contact HP if you are still within your service contract.

Humidifier (if installed)

Component to be inspected

Task

Frequency

Capable Party

 

 

 

 

 

Humidifier

Inspect for water leaks, verify

Every 2

Qualified personnel

 

that no sparks form between

 

weeks, if

 

 

the electrodes during

staffed

 

 

operation

Quarterly, if

 

 

Inspect the general operation

 

not staffed

 

 

of the cylinder.

 

 

 

Humidifier drains

Verify the following:

Quarterly

Qualified personnel

 

Drains are in working order

 

 

 

 

There is an air gap at the

 

 

 

 

funnel/drain entry into the site

 

 

 

 

system

 

 

 

 

Drain discharge is not getting

 

 

 

 

water on external equipment

 

 

 

 

or grounding system

 

 

 

 

 

 

 

Put the humidifier in system flush

Quarterly

Qualified personnel

 

mode and inspect drain flow and

 

 

 

 

water supply flow. Inspect, clean,

 

 

 

 

and/or replace as necessary.

 

 

 

Inspect for any internal or external

Quarterly

Qualified personnel

 

water leaks, repair or replace

 

 

 

 

leaking components.

 

 

 

Using LLS, verify proper cylinder

Quarterly

Qualified personnel

 

operation. Inspect the cylinder for

 

 

 

 

blackened areas and, if present,

 

 

 

 

check the condition of the

 

 

 

 

electrodes. If necessary, replace

 

 

 

 

the cylinder.

 

 

 

Replace the cylinder.

Annually

Qualified personnel

ECS

Component to be inspected

Task

Frequency

Capable party

 

 

 

 

Full system functional check

Check the operation of all system

Quarterly

Qualified personnel

 

components.

 

 

Check and clear the alarm log.

Quarterly

Qualified personnel

Inspect and test the ECS battery

Every 2 years

Qualified personnel

 

backup system.

 

 