Electrical

Maintenance of the electrical components might require the following:

Expose personnel to high voltage.

Allow personnel to come into direct contact with high voltage.

Power down the POD during the execution of the maintenance item.

You must explicitly state and acknowledge if a POD power down will be possible. If a power down is not possible, LLS inspections will be conducted and further action will be taken at your discretion.

Component to be inspected

Task

Frequency

Capable Party

 

 

 

 

 

 

Electrical connections

Use LLS to check for major

Quarterly

Licensed electrician

 

 

electrical connections (torque

 

 

 

 

marks, sizzle, and acrid odor):

 

 

 

 

Main/House Power Feeds

 

 

 

 

Busway End Feeds, Drop

 

 

 

 

 

Boxes (including cables and

 

 

 

 

 

cord caps)

 

 

 

 

Electrical panels, breakers,

 

 

 

 

 

and disconnects

 

 

 

 

 

 

 

 

POD SHUT DOWN REQUIRED

Annually

Licensed electrician

 

 

Conduct torque checks on the

 

 

 

 

following:

 

 

 

 

Main, house, and critical IT

 

 

 

 

 

power feeds

 

 

 

 

Electrical panels, breakers,

 

 

 

 

 

and disconnects

 

 

 

 

Busway end feeds, busway

 

 

 

 

 

sections, and drop box locking

 

 

 

 

 

mechanism (bolt)

 

 

 

 

 

 

 

 

Grounding

Grounding system residence test

Every 2 years

Licensed electrician

 

 

using the DUCTOR method

 

 

 

POD SHUT DOWN REQUIRED

Every 2 years

Licensed electrician

 

 

Ground and grounding

 

 

 

 

connection/lug located internal to

 

 

 

 

each electrical panel torque test.

 

 

 

 

Clean and re-tighten as necessary.

 

 

 

Service entrance grounding

Every 2 years

Licensed electrician

 

 

ground-rod/ground well and

 

 

 

 

grounding connection/lug located

 

 

 

 

external to the POD torque test.

 

 

 

 

Clean and re-tighten as necessary.

 

 

 

POD SHUT DOWN REQUIRED

Every 2 years

Licensed electrician

 

 

Service entrance ground

 

 

 

 

connection/lug located on the

 

 

 

 

switchboard (or landing location)

 

 

 

 

torque test. Clean and re-tighten as

 

 

 

 

necessary.

 

 

 

Grounding system bonding

Every 2 years

Licensed electrician

 

 

jumpers that connect racks to the

 

 

 

 

POD structure and rack to rack

 

 

 

 

torque test. Clean and re-tighten as

 

 

 

 

necessary.

 

 

 

 

 

 

 

Periodic maintenance 65