7. Install the DIMM.

8.Install the access panel on page 20.

9.Install the server into the rack (Installing the server into the rack on page 35).

10.Connect each power cord to the server.

11.Connect each power cord to the power source.

12.Power up the server on page 18.

Use RBSU ("HP ROM-Based Setup Utility" on page 102) to configure the memory mode.

For more information about LEDs and troubleshooting failed DIMMs, see "Systems Insight Display LED combinations on page 5."

Hot-plug hard drive options

When adding hard drives to the server, observe the following general guidelines:

The system automatically sets all device numbers.

If only one hard drive is used, install it in the bay with the lowest device number.

Drives should be the same capacity to provide the greatest storage space efficiency when drives are grouped together into the same drive array.