50 hour service

SERVICEJOURNAL

Work done

Date, mileage, stamp, sign

50 hour service

1.Clean / replace the air filter pre-filter (oil-foam element). (more regularly in dusty conditions)

2.Clean the engine cooling air intake and transmission air intake.

3.Clean the paper air filter.

4.Clean the fuel pump air filter.

5.Check/adjust cutting height setting.

6.Check/adjust parking brake.

7.Inspect flame guard/spark arrestor (optional equipment)

English – 55

Page 56
Image 56
Husqvarna Pro 15 manual hour service, Servicejournal, Work done