hussman P/N 0420057_B P/N 0420057B, Joining Instructions, Installing Coil Cover And Drip Tray

Models: P/N 0420057_B

1 46
Download 46 pages 55.32 Kb
Page 14
Image 14
JOINING INSTRUCTIONS

1-8INSTALLATION

11.Re-apply caulk or silicone as required.

12.Verify glass is positioned and operating cor- rectly.

Pivot Support

JOINING INSTRUCTIONS

Adjusting Bolt

Set Screw Positive Stop

Sectional construction means that two or more merchandisers may be joined in line yielding one long continuous display requiring only one pair of ends.

All joints must be air-tight to prevent formation of ice or condensation.

Refer to the detailed information provided in the separate Joining Instruction shipped with each case.

INSTALLING COIL COVER AND DRIP TRAY

Each gravity coil in these service merchandisers has a 4 ft (1219 mm) stainless steel coil cover and molded plastic drip tray. A condensate drip tube is factory installed.

Check the drip tray for obvious damage before installation. Damaged or leaking drip trays must be replaced. Remove any loose debris and clean the drip tray before installing.

Coil cover hooks and drip tray hooks are factory installed at the front and back in each gravity coil. Hanging holes are formed in the cover and drip tray.

Coil Cover

Drip Tube

Connection

P/N 0420057_B

U.S. & Canada 1-800-922-1919 • Mexico 1-800-522-1900 • WWW.HUSSMANN.COM

Page 14
Image 14
hussman P/N 0420057_B operation manual P/N 0420057B, Joining Instructions, Installing Coil Cover And Drip Tray