Open the WB Sequence Diagram.
Add the participants to the sequence diagram:
–Expand 00 Enterprise Level → Actors → LocalForecaster, and drag and drop the LocalForecaster system actor into this sequence diagram (Figure
Figure 6-54 Drag actor into the sequence diagram
–Expand 01 System Level → Logical Elements:
•Drag and drop the WeatherTrackingUI system into the sequence diagram.
•Drag and drop the WeatherTrackingController system into the sequence diagram.
•Drag and drop the DopplerController system into the sequence diagram.
•Drag and drop the GroundStation system into the sequence diagram
•Drag and drop the WeatherTrackingProcessor system into the sequence diagram.
–Save the work (Ctrl+s).
Chapter 6. Tool support for MDSD 135