SentinelRAID 170 Installation and Hardware Reference Manual

Figure 2-4: Install the Battery Charger Board

Step 4. Connect the BBU cable. The BBU cable can be connected to a white, 4- pin header on either the BBU charger board (see Figure 2-5) or at the back of the controller board (labeled J4) (see Figure 2-6). If the BBU cable is going to be connected to the charger board, the connections should be made now. If the BBU is going to be connected to the connector at the back of the board, the connection can be made now or after the chassis top cover has been replaced.

Figure 2-5: Connect the BBU to the BBU Charger Board

2-8

Battery Backup Unit (BBU) Installation

Page 30
Image 30
Infortrend SentinelRAID 170 320ML/sec SCSI-to-SCSI RAID Controller manual Install the Battery Charger Board