SentinelRAID 170 Installation and Hardware Reference Manual
Figure 2-2: Install the DIMM Module
Step 3. Replace the chassis top cover. Once the DIMM module has been installed and if no other items (e.g., BBU module or expansion daughter board) are being installed on the controller board, reinstalled the chassis top cover. For further instructions on how to reinstall the chassis top cover, please refer to Section 2.6.2.
2.8.Battery Backup Unit (BBU) Installation
2.8.1About the First BBU Installation
♦It is possible that the linking cable connecting the
♦A battery has a tendency to "remember" its capacity. In order to make full use of the capacity of your battery cells, allow the battery cell pack to become fully charged when installed for the first time. It will take 24 hours for the battery to become completely charged for the first time. Once the battery module is installed and the controller is powered on, the battery will automatically start charging. Do not power down the controller during the first 24 hours after the BBU has been installed. If the controller power is turned off and there is unwritten data in the cache memory, the battery will start discharging.
♦Inspect the BBU regularly and replace it every TWO years; use an official battery pack replacement and only use them with specified RAID controllers.
♦When replacing the controller’s DIMM module, be sure to disconnect the BBU.
Battery Backup Unit (BBU) Installation |