Maintaining Your Server

Upgrading from a Fixed Power Supply to a Hot Swap Power Supply

WARNINGS

Hazardous conditions, power supply: Hazardous voltage, current, and energy levels are present inside the power supply. There are no user-serviceable parts inside it; servicing should be done by technically qualified personnel.

1.Disconnect power to the chassis after shutting down the server.

2.Remove the Primary Access Cover (see “Remove Primary Access Cover” in Chapter 2 for step-by-step instructions).

3.Remove the Air Ducts (see “Remove Air Ducts” in Chapter 2 for step-by-step instructions).

4.Disconnect all internal power cables from chassis components and server board.

5.Remove the eight screws holding the Fixed Power Supply shield in place (letter “A”). Remove the two screws holding the Fixed Power Supply inside the power supply bay (letter “B”). Remove the Fixed Power Supply (letter “C”).

C

B

A

TP00694

Figure 61. Removing Fixed Power Supply

52

Intel® Server Chassis SC5300 User Guide

Page 70
Image 70
Intel SC5300 BRP, SC5300 LX manual Removing Fixed Power Supply