
4221 Condor Hardware Installation Procedures
Step 5. Power Off SystemOnce the board is configured, ensure that the host system and peripherals are turned OFF.
CAUTIONSystem power and peripheral power must be turned OFF before attempting to install the Condor. Failure to do so may result in severe damage to the board and/or system.
Step 6. Cabling ProcedureThe cabling procedure depends on how you wish to configure the system. Your options are summarized in Table
Table
|
|
|
|
| TO IMPLEMENT | CABLING OPTIONS |
|
|
|
|
|
| Ethernet Single Channel AUI/10BaseT Daughter | Front Panel I/O, connect a cable to P3 (RJ45) or P4 (DB15) on |
|
| Card | the front of the Ethernet Single Channel AUI/10BaseT |
|
|
| Daughter Card. |
|
|
| Note: Only one cable or interface type can be used at a time. |
|
|
|
|
|
| Dual 10BaseT Ethernet Daughter Card | Front Panel I/O, connect cables to P3 & P4 (RJ45) on the front |
|
|
| of the Dual Channel 10BaseT Ethernet Daughter Card. |
|
|
|
|
|
| Dual AUI Ethernet Daughter Card | Front Panel I/O, connect cables to P3 & P4 (DB15) on the front |
|
|
| of the Dual Channel AUI Ethernet Daughter Card. |
|
|
|
|
|
51