C2000 and C4000 1.0.x Hardware Guide

 

Rack-Mounted Installation

14

 

Installation Guidelines

14

 

Preparing the Equipment Racks

14

 

Installing the System

14

 

Cabling the System

15

 

Cabling the Management Console

15

 

Management Ports

15

 

Cabling Ethernet Interfaces

16

 

Cabling the System for Power

16

 

The Next Step

18

Chapter 4

Powering Up the C-series Platform

19

 

Powering Up

19

 

Status LEDs

20

 

The Next Step

20

Chapter 5

Setting the Initial Configuration

21

 

Configuration Overview

21

 

Setting Up Management Access and Logging In

21

 

Configuring the Juniper Networks Database

22

 

Configuring Hostname and Domain Parameters

23

 

Configuring the System for Remote Access

24

 

Configuring the System to Accept SSH and Telnet Connections

25

 

Adding an Admin User Account

26

 

The Next Step

27

Part 3

Hardware Maintenance Procedures and Specifications

 

Chapter 6

Maintaining the System

31

 

Required Tools and Items

31

 

Storing Modules and Components

32

 

Cleaning the System

32

 

Removing and Installing a Fan

32

 

Removing and Installing a Power Supply Module

33

 

Removing and Installing a Hard Drive

34

Chapter 7

System Specifications

35

 

C2000 Model Specifications

35

 

C4000 Model Specifications

36

viTable of Contents

Page 6
Image 6
Juniper Networks C4000 Part Hardware Maintenance Procedures and Specifications, Chapter Setting the Initial Configuration