To install a tape drive in a
1.Read the safety information that begins on page v and “Installation guidelines” on page 29.
2.Turn off the server and peripheral devices, and disconnect the power cords and all external cables.
Attention: In a dc power environment, only trained service personnel other than Lenovo service technicians are authorized to connect or disconnect power to the dc power supply. See the documentation that comes with each dc power supply.
3.Remove the server cover (see “Removing the cover” on page 31).
4.Remove the
5.Remove the filler panels from the two
6.If you have not attached the space filler from the tape enablement kit to the
7.From the inside of the server, thread the
8.Connect the cables to the back of the tape drive.
9.Push the
10.Push the tray handle to the closed (locked) position.
11.Connect the cable connectors to the following
vSignal connector: SATA tape drive signal connector, J102
vPower connector:
The following illustration shows the routing of the SATA tape drive signal cable.
Important: Make sure that the cables avoid any fan connectors.
Chapter 2. Installing optional devices 51