DECK MECHANISM DISASSEMBLY

Gear Assembly P2 Hole

 

 

Gear Assembly P3 Hole

 

 

 

 

Gear Assembly P3

 

 

(Fig. A-8-2)

Lever Spring Boss

Gear Sector Hole(A)

 

 

Gear Assembly P2

 

Plate Slider Hole(B)

 

(Fig. A-8-1)

 

 

 

(B)

(A)

 

 

 

Chassis

 

 

Base Assembly P3

 

 

(Fig. A-8-4)

Base Assembly P2

 

 

 

Fig. A-8(Fig. A-8-3)

29. Gear Assembly P2 (Fig. A-8-1)/ Gear Assembly P3 (Fig. A-8-2)

1)Just lift the Gear Assembly P2 up.

2)Just lift the Gear Assembly P3 up.

NOTE

When reassembling, align the two holes of the Gear Assembly P2 and P3 in a straight line after confirmation whether the Gear Sector Hole(A) and the Plate Slider Hole(B) are aligned or not as Fig.

30. Base Assembly P2 (Fig. A-8-3)/ Base Assembly P3 (Fig. A-8-4)

1)Move the Base Assembly P2 in direction of arrow(A) along the guide hole of the Chassis and disassemble it on bottom side.

2)Move the Base Assembly P3 in direction of arrow(B) along the guide hole of the Chassis and disassemble it on bottom side.

4-10

Page 47
Image 47
LG Electronics TL-AT130M service manual Gear Assembly P2 Fig. A-8-1/ Gear Assembly P3 Fig. A-8-2