Lochinvar SNR150-100 4Vertical direct venting, Vertical termination – optional concentric vent

Models: SNA400-125 SNR150-100 SNA285-125 SNR200-100 SNA500-125

1 72
Download 72 pages 52.95 Kb
Page 28
Image 28
Figure 4-6Concentric Vent Roof Installation

TM

Installation & Service Manual

4Vertical direct venting

Vertical termination – optional concentric vent

￿WARNING

Do not operate the appliance with the rain cap removed or recirculation of combustion products may occur. Water may also collect inside the larger combustion air pipe and flow to the burner enclosure. Failure to follow this warning could result in product damage or improper operation, personal injury, or death.

CAUTION

DO NOT use field-supplied couplings to

extend pipes. Airflow restriction will

 

 

occur.

7. Install the rain cap and the small diameter pipe assembly

into the roof penetration assembly. Ensure the small

diameter pipe is cemented and bottomed in the Y

concentric fitting for #CVK3003 installations and

fastened tightly into the rubber adapter for #CVK3007

installations.

5.Install the Y concentric fitting pipe assembly up through the structure’s hole and field supplied roof boot/flashing.

NOTICE

Do not allow insulation or other materials

to accumulate inside the pipe assembly

 

 

when installing through the hole.

6.Secure the assembly to the roof structure as shown below in FIG. 4-6 using field supplied metal strapping or equivalent support material.

Figure 4-6Concentric Vent Roof Installation

Note: CVK3003 shown for illustration purposes.

NOTICE

Ensure termination height is above the

roof surface or anticipated snow level

 

 

 

(12 inches in U.S.A. or 18 inches in

 

Canada) as shown in FIG. 4-4, page 27.

 

If assembly is too short to meet height

NOTICE

requirement, the two (2) pipes supplied

 

 

in the kit may be replaced by using the

 

same diameter, field supplied SDR-26

 

PVC (D2241) pipe for #CVK3003 and

 

standard schedule 40 PVC for

 

#CVK3007. Do not extend dimension

 

D* more than 60 inches (see FIG.’s 3-9

 

and 3-10, page 23).

8.

Cement the appliance combustion air and vent pipes to

 

the concentric vent termination assembly. See FIG. 4-6

 

for proper pipe attachment.

9.

Operate the appliance through one (1) heat cycle to

 

ensure combustion air and vent pipes are properly

 

connected to the concentric vent termination

 

connections.

Multiventing vertical terminations

When two (2) or more direct vent appliances are vented near each other, each appliance must be individually vented (see FIG. 4-7). NEVER common vent or breach vent this appliance. When two (2) or more direct vent appliances are vented near each other, two (2) vent terminations may be installed as shown in FIG. 4-7. The vent terminations must be at least 36 inches away from the first two (2) terminations. It is important that vent terminations be made as shown to avoid recirculation of flue gases. Dimension A in FIG. 4-7 represents the distance between pipes or rain shields, as touching or a 2 inch maximum separation.

Figure 4-7Concentric Vent and Combustion Air Vertical Termination (Dimension A as Touching or 2 inches Maximum Separation)

Multiventing vertical terminations 28 Manual background

Page 28
Image 28
Lochinvar SNR150-100, SNA500-125 4Vertical direct venting, Vertical termination – optional concentric vent, Notice