2. Installation
2.9 Installing the PowerServices TelPac external unit for Galaxy UPSs
Installation must be carried out by our technicians.
Installation of the PowerServices TelPac external unit requires UPS shut down, load tranfer to bypass and removal of three protective panels.
Refer to the UPS’s user manual to carry out
Galaxy view with doors open and protective panels removed
17
18
|
| Installation, connections |
|
| 1 - Open the doors giving access to the |
|
| switch handles, |
|
| 2 - Carry out the UPS |
|
| and remove the three protective panels, |
|
| 3 - Check: |
|
| ◗that the UPS is equipped with at least one |
| 21 | GTCZ communication card 17 and one |
|
| |
XR11 |
| RAUZ card 18 . |
|
| ◗that a protected and |
|
| 19 is available. |
|
| 4 - Configure the RAUZ and GTCZ card as |
|
| indicated in section 2.6. |
1 black | 19 | 5 - Connect the power supply adapter to the |
2 brown |
| |
4 red | 20 | supply cord 20 out through the grommet in |
| panel A. | |
|
| |
XR11 |
| 6 - Connect, install then fix link cable 21 . |
RAUZ card |
| Bring the other end of the cable out through |
|
| |
|
| the grommet in panel A. |
|
| 7 - Replace the protective panels. |
Page 26 - 34003602EN/AB