MGE UPS Systems 100 installation manual Configuring the shielding terminal, = Shielding

Models: 100

1 30
Download 30 pages 36.99 Kb
Page 20
Image 20

2. Installation

Configuring the shielding terminal

When electrical measurements are to be made on the RS485 link, it is possible to configure the shielding terminal of terminal block 7 as a "0V" terminal. The holes above each terminal allow a measurement probe to be inserted.

1 2 3

Default position,

= "SHIELDING"

1 2 3

Phone

CD

UPS

Settings

JBUS / RS485

= "0V"

 

A 5V B R+ R- T+ T-

 

 

 

TelPac

7

Terminal block for the RS485 serial link to MGE UPS SYSTEMS equipment.

Page 20 - 34003602EN/AB

Page 20
Image 20
MGE UPS Systems 100 installation manual Configuring the shielding terminal, = Shielding