MGE UPS Systems 100 installation manual Galaxy view with doors open and protective panels in place

Models: 100

1 30
Download 30 pages 36.99 Kb
Page 27
Image 27

Galaxy view with doors open and protective panels in place

< 3m

21

22

(A)

20

22

2. Installation

8 - Clean the planned location for the external unit using the cleaning kit provided (see figure).

9 - Remove the adhesive protection from under the external unit.

10 - Place the unit as shown.

11 - Press down hard for 10 seconds to fix the adhesive.

12 - Connect the power supply cord 20 to the back of the external unit (5V DC).

13 - Connect the one end of the telephone cable 22 to the "phone" port on the external unit and the other end to the telephone outlet. If the wall outlet is not compatible with the connector on the cable, use an adapter. 14 - Connect the cable 21 to the JBUS / RS485 terminal block on the card:

-wire T- on terminal T-,

-wire R+ on terminal R+,

-shielding.

34003602EN/AB - Page 27

Page 27
Image 27
MGE UPS Systems 100 installation manual Galaxy view with doors open and protective panels in place