Weigh Hopper Installation

Weigh Hopper Installation

Remove the weigh hopper from the shipping box and install it in the blender on the load cell brackets. Connect the airline and close the mixer door, securing the latch.

Figure 25: Weigh Hopper

Note: THE WEIGH HOPPER ASSEMBLY MUST HANG FREELY AND BE FREE FROM FRICTION, WITH NO MECHANICAL OBSTRUCTIONS OTHER THAN THE LOAD CELL ITSELF.

Final Connections

Connect the blender to the appropriate power source.

Connect the compressed air piping, ensuring that a 5-micron air filter is installed, along with the proper water trap, and lubrication unit, if required. Verify that 60 psi (4.14 bar) of clean, dry compressed air is supplied to the blender.

Note: Again, make sure that proper air supply connections are made to the blender, as dirty, contaminated, wet air can damage blender components eand can quickly cause poor performance and accuracy!

Note: Make sure that the blender is supplied with clean, dry, 60 psi (4.14 bar) compressed air.

After powering up the blender the following screen will be shown:

Figure 26: Display Startup Screen

Note: It may take 45-50 seconds for the screen to appear.

BF1-615.3

Chapter 3: 2BInstallation

36 of 101

Page 36
Image 36
Mitsubishi Electronics 882.00273.00 specifications Weigh Hopper Installation, Final Connections, Display Startup Screen