Chapter 5: Maintenance

Chapter 5: Maintenance

5-1 Preventative Maintenance Schedule

The mechanical design of the blender is very simple and very little maintenance is required. The only moving parts are the metering gates, weigh hopper dump valve, and mixer agitator. The checklist below contains a list of items which should be inspected and/or replaced to keep your blender operating at peak efficiency. Perform each inspection at the regular intervals listed below.

Figure 50: Sample Preventative Maintenance Schedule

System model #

 

 

 

 

 

 

Serial #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Daily

Date/

Date/

Date/

Date/

 

Date/

 

Date/

Date/

Date/

Date/

 

Date/

Date/

Date/

Date/

By

By

By

By

 

By

 

By

By

By

By

 

By

By

By

By

Inspect blender for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

any loose parts-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

tighten them

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

immediately.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Verify quality of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

compressed air

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

supply.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Verify mixer door is

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

properly latched.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Every week

Date/

Date/

Date/

Date/

 

Date/

 

Date/

Date/

Date/

Date/

 

Date/

Date/

Date/

Date/

By

By

By

By

 

By

 

By

By

By

By

 

By

By

By

By

Inspect metering

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

gates for proper

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

operation.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check to make

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sure that all hose

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

connections are air

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

tight.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Every month

Jan

Feb

Mar

Apr

May Jun Jul Aug

Sep

Oct

Nov

Dec

Inspect air regulator

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and air safety

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

circuits, if equipped.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Recalibrate blender only If necessary.

Photocopy this page for your maintenance records

BF1-615.3

Chapter 5: 4BMaintenance

64 of 101

Page 64
Image 64
Mitsubishi Electronics 882.00273.00 Sample Preventative Maintenance Schedule, System model #, Serial #, Daily