MECHANICAL PARTS REWORK AND REPAIR: Mechanical Parts Rework Procedure

9.5.10 M2 (2 Pin-Contact)

Top 330ºC - Bottom 100ºC

N-Q07

OK Industries

151/min

“J” over J753 during Removal Procedure.

Pace

6/7

“J” over J753 & “F” over M2 during Installation

 

 

Procedure.

9.5.11 J753 (Microphone Socket)

Top 330ºC - Bottom 100ºC

N-P20

OK Industries

151/min

“F” over M2 during Removal Procedure.

Pace

6/7

“F” over M2 & “C” over J753 during Installation

 

 

Procedure.

9.5.12 SW-all (Key/Switch)

Top 330ºC - Bottom 100ºC

N-Q07

OK Industries

151/min

“I” over nearby SW during Removal Procedure.

Pace

6/7

“I” over nearby SW & “I” over replaced SW during

 

 

Installation Procedure.

NOTE: Use Flux Pen Indium-Indalloy NC771 ONLY (Motorola P/N 1185768C01). Use flux sparingly.

NOTE: Always protect switches from heat and Flux intrusion to avoid component malfunction.

NOTE: Keep alcohol or solvent away from switch area after rework to avoid reliability issues.Tack down a couple of leads if necessary.

68P80401P05

83

Page 98
Image 98
Motorola I580 service manual 10 M2 2 Pin-Contact, 11 J753 Microphone Socket, SW-all Key/Switch