Section 2

Installation

 

 

Vertical Installation

To install the Wireless Ethernet Bridge vertically, as shown in the illustration below:

1Insert the Wireless Ethernet Bridge into the supplied base. Ensure that the antenna’s location is on top. The Wireless Ethernet Bridge’s foot slides snugly into the base to keep the WE800G stable.

2Follow the procedures in “Electrical Connection to Wireless Ethernet Bridge” located later in this section to connect the WE800G.

2-4

WE800G

Page 23
Image 23
Motorola WE800G manual Vertical Installation