Index
FieldPoint FP-3000 User Manual I-8
©
National Instruments Corporation
power
calculating power for FieldPoint bank,
2-10
connecting power to FP-3000, 2-9
initial power on procedure, 3-1
POWER LED, 2-12
power-on self test (POST), 2-10
4-20 mA pressure sensor, converting to
Fieldbus (example), 3-2 to3-6
assigning tag to new block, 3-3
bringing block online, 3-6
creating function block, 3-2 to 3-3
scaling the reading, 3-4
selecting module and channel, 3-3
setting input range, 3-4
setting up scheduling, 3-5
problem solving. See troubleshooting.
PROCESS LED, 2-13
Proportional-Integral-Derivative function
block. See PID control; PID
(Proportional-Integral-Derivative) function
block.
PV parameter, C-16
PV_FTIME parameter, C-16
PV_SCALE parameter, C-16
Q
Quality subfields for status handling
(table),4-9
questions and answers. See troubleshooting.
R
RATE parameter, C-16
RCAS_IN parameter, C-17
RCAS_OUT parameter, C-17
READY LED, 2-12
remote cascades, D-3
RESET parameter, C-17
Reset switch, A-2
resource block
configuration problems (table), B-6
description, 4-2
RESTART parameter (table), C-17
ROUT_IN parameter, C-17 toC-18
ROUT_OUT parameter, C-18
RS_STATE parameter (table), C-18
S
SAFEGUARD_CL parameter, C-18
SAFEGUARD_OP parameter, C-18
scaling the reading
converting 4-20 mA pressure sensor to
Fieldbus (example), 3-4
temperature control with FP-3000
(example), 3-8 to 3-9
scheduling, setting up
converting 4-20 mA pressure sensor to
Fieldbus (example), 3-5
temperature control with FP-3000
(example)
controlling heating element, 3-12
taking temperature readings, 3-9
SET_FSTATE parameter, C-19
SHED_OPT parameter (table), C-19
SHED_RCAS parameter, C-19
SHED_ROUT parameter, C-19
Simulate Enable switch, A-1
SIMULATE parameter, C-20
software configuration problems, B-3to B-6
generic software configuration problems
(table), B-4 to B-6
overview, B-3
resource block configuration problems
(table), B-6
specifications
compliance, E-1
environment, E-1
network, E-1
SP_HI_LIM parameter, C-20