NDA-24318 CHAPTER 4
Page 49
Issue 1
OPERATION TESTS AFTER INSTALLATION
3. FCCS NETWORKING VIA IP [F-36]
When using the IPTRK circuit card for FCCS Networking via IP [F-36] (Point-to-
Multipoint Connection), perform the following circuit card operation tests. If necessary,
perform fault repairs.
Caution:Some LSIs on this circuit card may be hot. Handle with care.
1. Test of OPE lamp on IPTRK circuit card:
a.) See if the OPE lamp on the IPTRK circuit card is lighting green. This lamp will light if the circuit
card is operating normally.
b.) When the OPE lamp is OFF, initialize the circuit card, or perform the insertion/extraction of the
circuit card once or twice. If the lamp still do es not light, replace the circuit card.
2. Test of SUBOPE0 and SUBOPE1 lamps on IPTRK circuit card:
a.) See if the SUBOPE0 and SUB OPE1 lamps on the IP TRK circuit card are lighting green. No te
that SUBOPE1 should light if the circuit card is furnished with an optional sub board (PZ-
8VCTB).
b.) When either (or both) of the lamps are OFF, ini tialize the circuit ca rd, or perform the insertion/
extraction of the circuit card once or twice. Also, if a sub board is in use, make sure the daughter
board is securely attached to the IPTRK circuit card (m ain boar d). If t he lamp st ill doe s not lig ht,
replace the circuit card.
Figure 4-2 Lamps to be Tested (FCCS Networking via IP [F-36] [Point-to-Multipoint Connection])
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
SUBOPE3
SUBOPE2
BUSY
L3
L2
L1
IP-TXRX
IP-100M
F-TXRX
F-100M
F-COL
MODE
IPCON
FCON
MB
MBR
Not Used
Not Used
OPE
Is IPTRK card operating
normally?
IP-LRR
Is IP network available
for connection?
IP-LINK
Is IPTRK-IP network link
physically established?
SUBOPE1
Is CPU of sub board
operating normally?
L1
Is FCCS network
link established?
SUBOPE0
Is CPU of IPTRK cards
main board operating normally?
IP-COL
IPTRK Circuit Card
Sub Board (PZ-8VCTB)
F-LRR
Is FCCS network available
for connection?
F-LINK
Is IPTRK-FCCS network
link physically established?