Operation Procedure
Start
Turn on distribution board. (See step 1 in next page.)
Turn on console PC.
(See step 2 in next page.)
Turn on peripherals.
(See step 3 in next page.)
Turn on CBs and AC SWs in expansion cabinet.
(See steps 4 to 6 in next page.)
Turn on CBs and AC SWs in main cabinet.
(See steps 7 to 9 in next page.)
Operation on SP console.
(See steps 10 to 14 in next page.)
OS Boot
When the expansion cabinet is used.