INSTALLATION, OPERATION, AND

INSTALLATION, OPERATION, AND

MAINTENANCE INSTRUCTIONS

MODEL 21

READ THIS FIRST

IMPORTANT INSTRUCTIONS

The New Buck Corp. non-catalytic systems have been tested by ITS, Warnock Hersey to ANSI/UL Standards 1482.

Install and operate your units according to instructions provided in this manual. Local building codes may apply; therefore, contact your local building inspector or fire marshal for necessary installation requirements and permits which may go beyond these instructions. The authority having jurisdiction should be consulted before installation to determine the need to obtain a permit.

If appliance is installed in mobile homes: “DO NOT INSTALL IN SLEEPING ROOMS.”

The Model 21 is approved for use in specified Pre-Fabricated fireplaces (ZCF’s). Use the list on Page 11 or contact your dealer for additional units.

Examine the masonry fireplace and chimney prior to installation of the fireplace accessory to determine that the construction meets the minimum fireplace construction requirements illustrated in the instructions, that it is free from cracks, loose mortar, creosote deposits and other blockage, or other signs of deterioration.

2

Page 4
Image 4
New Buck Corporation 21 installation instructions Installation, Operation, And, Maintenance Instructions Model