Tower Setup

INSTALLATION

5.If you are installing the UPS in a tower configuration, continue to the following section, “Tower Setup.”

If the UPS is in a rack and you are installing an optional EBM, continue to “EBM Installation” on page 19; otherwise, continue to “Plug-Receptacle UPS Installation” on page 21 or “Hardwired UPS Installation” on page 24.

Tower Setup

The UPS and any optional cabinets must be stabilized with pedestals or joining brackets. The setup varies depending on the number of cabinets you are installing:

1.For one cabinet, the pedestals must be installed (purchased separately). Complete Steps 2 through 4.

For two or more cabinets, the pedestals are not installed. Skip to Step 5 to install the supplied joining brackets.

2.Place the UPS horizontally so that the left end of the cabinet is accessible (see Figure 5).

3.Align the UPS pedestals over the holes on the end of the UPS as shown in Figure 5. Secure the pedestals with the supplied screws.

Figure 5. Installing the UPS Pedestals

4.Carefully position the cabinet upright (see Figure 6).

Continue to “Plug-Receptacle UPS Installation” on page 21 or “Hardwired UPS Installation” on page 24.