INSTALLATION
Figure 6. UPS Cabinet with Pedestals
5.Carefully position the cabinets upright (see Figure 7).
NOTE The EBM(s) must be installed to the right of the UPS as shown in Figure 7. Joining brackets are required for installations with two or more cabinets.
Figure 7. Tower UPS with an EBM
18EATON Powerware® 9125