Chapter 2

Installation

This chapter describes the basic installation procedures for the MBE unit, including:

Site requirements and prerequisites

Package contents

Equipment needed

Installation and setup.

 

2.1 Introduction

 

MBE is delivered completely assembled. For instructions on installation of a single

 

unit or two units in a 19-inch rack refer to the Rack Mounting Kit for 19-inch Racks

 

guide that comes with the RM kit.

 

After installing the unit, see Chapter 3, Operation for operating instructions.

 

In case a problem is encountered, refer to Chapter 4 for fault isolation and

 

troubleshooting instructions.

Note

 

Any adjustments, maintenance or repairs should be performed only by a skilled

 

technician who is aware of the hazards involved.

 

Always observe standard safety precautions during installation, operation, and

 

maintenance of this product.

2.2 Site Requirements and Prerequisites

Inspect the equipment container before unpacking. Note and report evidence of damage immediately to your RAD distributor.

Install the MBE unit within 1.5m (5 ft) of a grounded AC outlet furnishing 240V (115V).

Allow at least 90 cm (36") of frontal clearance for operator access. Allow at least 10 cm (4") clearance at the rear of the unit for interface cable connections.

The ambient temperature should be regulated between 0° to 50°C

(32°F to 122°F) at a relative humidity of up to 90%, non-condensing.

 

Site Requirements and Prerequisites

2-1

Order from: Cutter Networks

Ph:727-398-5252/Fax:727-397-9610

www.bestdatasource.com

Page 27
Image 27
RAD Data comm MBE10-1 Introduction, Site Requirements and Prerequisites, Technician who is aware of the hazards involved