Location of Controls
START-UP
PROCEDURES
before Start-Up
Safe lighting and other performance criteria were met with the gas manifold and control assembly provided on the heater when the heater underwent tests speci- fied in the latest edition of the ANSI Z21.10.3/CSA 4.3 Standard.
General
Before lighting up a new installation, water should be flowing through the heater. Water pressure regulator should be set to minimum 25 PSI.
CAUTION: Propane gas is heavier than air and sinks to the ground. Exercise extreme care in light- ing heater in confined areas.
Initial Start-Up - Pump and Motor
Many pumps are now
Clean dust and lint from pump and motor. Check pump coupler and tighten if necessary.
Flush system before putting into operation to ensure that foreign material does not damage pump seals.
CAUTION: Pump must be off to check oil in bearing assembly. Do not run pump without water in system.
30