INSTALLATION
FINISHING
INSTALLATION
NON-COMBUSTIBLE REQUIREMENTS
|
|
| Metal |
| |
|
|
| Stud |
| |
|
|
| (1130mm) |
| |
|
|
|
|
| |
(392mm) |
|
|
|
| |
| Material |
|
| ||
|
|
|
| ||
|
| combustible Material | combustible Material | ||
(814mm) | (803mm) | ||||
|
|
|
|
| |
|
| Finished Floor | 3" | ||
|
| (163mm) |
|
| (76mm) |
Diagram 1
Note: All
Rough edges may be visible, from an angle, through the 1/2" gap behind the faceplate.
To obtain a clean edge, facing material edges may be finished with a
Important: Materials used must be
1)Finishing material such as tile, river rock, etc. must not protrude beyond the front facing flanges on all 4 sides of the firebox opening.
2) If material such as brick, stone, etc. extends past the faceplate depth, when finishing around the faceplate, the minimum opening dimension noted below (Diagram 3) must be adhered to - to ensure the faceplate can be removed.
36 |
Diagram 3
Important:
A3/4" gap must be maintained all around the outer edge of the faceplate and the edge of any finishing material thicker than
This gap is required to facilitate the installation of the faceplate and to ensure the removal of the faceplate for service access.
3/4" |
Finishing Material |
(thickness + |
Diagram 4
Diagram 2
12 | Regency® L676S Direct Vent Gas Fireplace |