Regency P40 Framing & Finishing, Installation, Height = 42-1/2plus height of hearth, Diagram

Models: P40 P40-LP P40-NG

1 48
Download 48 pages 12.68 Kb
Page 11
Image 11
FRAMING & FINISHING

FRAMING & FINISHING

1)Frame in the enclosure for the unit with framing material. The framed opening for the assembled kit is 42-1/2" high x 40-1/2" wide x 20-1/16"

deep (1080mm H x 1029mm W x 508mm D), see Diagram 1. Also see Diagram 2 for corner installations.

Note: Height is from the base of the unit. Take into consideration the hearth height and material.

Height = 42-1/2" plus height of hearth.

INSTALLATION

INSTALLATION

Diagram 1

Diagram 2

Diagram 3

Note: When constructing the framed opening, please ensure there is access to install the gas lines when the unit is installed. See diagram 3 for details.

2)For exterior walls, insulate the enclosure to the same degree as the rest of the house, apply vapour barrier and drywall, as per local installation codes. (Do not insulate the fireplace itself.)

3)The unit does not have to be completely enclosed in a chase. A non- combustible header must be used. You must maintain clearances from the vent to combustible materials: See "Clearances" section. Combustible materials can be laid against the side and back standoffs and the stove base.

The HeatWave Duct Kit has different clearance and framing requirements, check the HeatWave manual for details.

Regency® P40 Direct Vent Gas Fireplace

11

Page 11
Image 11
Regency P40-NG, P40-LP Framing & Finishing, Installation, Height = 42-1/2plus height of hearth, Diagram Diagram